Recommend
Remove File
Remove document <span id="remove-document-name"></span> from <span id="remove-cart-name"></span>?
Reference Report
[REF0400-0007-E]
Application
Overhead monorail system in a paint finishing system with shifting bridge
Operator
Kovotex,České Budějovice
Customer
Datel, CZ
Product
C-80 rails
Total load
625 kg
Length of the bridges
5 m
Specific features
shifting bridge with three bridges
For transport within a facility, Conductix-Wampfler’s modular handling systems can provide customized transport solutions that ensure an optimum material flow. Various additional components, such as switching systems and curves, allow for the creation of complex tracks. The modular nature of the system and its simple assembly make it possible to plan and install a manual suspension track for many different applications.
Manual suspension tracks offer the following benefits:
Manual suspension track components